In Preview
Option to postpone scheduled Connector upgrades by 2 weeks
Send us your feedback about this articleOccasionally customers require scheduled upgrades to be postponed due to external factors such as audit events or other changes happening at the same time. This feature introduces the option to postpone a scheduled connector upgrade by an additional 2 weeks. This can only be done once.